All regions

Scaleway

🇫🇷 Paris

Francefr-par

48gCO₂/kWh

Carbon intensity

87%

Renewable energy

~6ms

Latency from France

99.95%

Availability SLA

€28/month

Standard VM

Carbon intensity — 12 months

Monthly grid average in gCO₂eq/kWh (seasonal trend)

Electricity mix

Estimated generation sources — 87% renewable

Latency vs nearby regions

Estimated round-trip time from France, in milliseconds

Estimated pricing

Indicative monthly list prices in Paris — actual prices depend on commitment and usage.

Nano

1 vCPU · 1 GB RAM

€7/mo

Small

2 vCPU · 4 GB RAM

€17/mo

Medium

4 vCPU · 16 GB RAM

€28/mo

Large

8 vCPU · 32 GB RAM

€56/mo

XLarge

16 vCPU · 64 GB RAM

€112/mo

GPU

8 vCPU · 1× GPU · 48 GB RAM

€336/mo

Frequently asked questions

How green is the Scaleway Paris region?

Paris scores 93/100 on our Green Score. Its grid runs at 48 gCO₂eq/kWh with 87% renewable energy — one of the greenest choices available today.

How is the Green Score calculated?

The score blends five weighted criteria: carbon intensity (40%), renewable energy (25%), availability (15%), latency (10%) and price (10%). Each metric is normalized to 0–100 before weighting.

Where does the data come from?

Carbon and renewable figures are based on public grid data (Electricity Maps, national TSOs) and provider sustainability reports. Prices are indicative list prices for a 4 vCPU / 16 GB VM. The data layer is designed to plug live APIs in later.

What latency should I expect from France?

We estimate ~6 ms round-trip from mainland France to Paris. Real-world latency varies with your network path and peering.

At a glance:48 gCO₂/kWh87% renewable~6 ms99.95% SLAGreen Score 93/100